cpnybjtp

Products

Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

While using the Client-Oriented organization philosophy, a rigorous high quality command process, highly developed production devices and a potent R&D workforce, we normally provide high quality products, outstanding solutions and aggressive charges for Cnc Stepper Motor Driver, Arm In Robotics, Diy 3d Printed Robot Arm, Leading the trend of this field is our persistent objective. Supplying first class solutions is our intention. To create a beautiful upcoming, we wish to cooperate with all close friends in the home and overseas. Should you have got any interest in our products and solutions, remember to never wait to call us.
Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker Detail:

Product Parameters

Application: Lathe and Turning Center, CNC Boring Machine, CNC wood working machine, CNC Milling machinery, CNC drilling machinery, and especially automatic equipment

Axis: 1-10axis

Machinery Test Report: Provided.

Function: Support ATC, Macro function, and PLC displayer

Core Components: PLC, CNC, Macro program, CNC controller.

CPU: ARM(32bits)+DSP+FPGA.

Port: 56input 32output

Weight: 8KG

User Store Room: 128Mb

Interface:USB+RS232 Communction Port.

Supply Ability:10000 Set/Sets per Month.

Warranty:2 Years

product-description1

Parameter details(G code shows)

1. Locate rapidly: G00
2. Straight line interpolation: G01
3. Arc interpolation: G02/03
4. Cycle of cutting cyliner or cone: G90
5. Cycle of cutting end face: G94
6. cycle of cutting thread: G92
7. Fixed cycle of tapping: G93
8. Cycle of rough cut in excircle: G71
9. Cycle of rough cut at end face: G72
10. Cycle of closed cut: G73
11. Cycle of drill deep hole at end face: G74
12. Cycle of cutting groove with external diameter: G75
13. Cycle of cutting compound thread: G76
14. Cycle of program: G22,G800
15. Local coordinate system: G52

16. Detect the instruction of skip: G31,G311
17. Pole coordinate: G15, G16
18. Metrical/Imperial programme: G20,G21
19. Set coordinate, offset: G184,G185
20. Workpiece coordinate system: G54~G59
21. Tool radius C: G40, G41, G42
22. Accurate locating/continuous path process: G60/G64
23. Feeding mode: G98,G99
24. Backing to start point of program: G26
25. Backing to the fixed point: G25, G61, G60
26. Backing to the datum point: G28
27. Suspend: G04
28. Macro Program: G65, G66, G67
29. Auxiliary function: S, M, T

Customer Praise

Customer praise  (1)
Customer praise  (13)
Customer praise  (14)
Customer praise  (16)
Customer praise  (17)
Customer praise  (15)

Customer Case

Customer praise  (18)
Customer praise  (23)
Customer praise  (19)
Customer praise  (20)
Customer praise  (21)
product-description1
Customer praise  (22)


Product detail pictures:

Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures


Related Product Guide:

Every single member from our large efficiency revenue team values customers' wants and company communication for Wholesale Price Cnc Controller Router - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker , The product will supply to all over the world, such as: Mauritania, Paraguay, Chicago, In order to make more people know our products and to enlarge our market, we have devoted a lot of attention to technical innovations and improvement, as well as replacement of equipment. Last but not the least, we also pay more attention to training our managerial personnel, technicians and workers in planned way.
  • Speaking of this cooperation with the Chinese manufacturer, I just want to saywell dodne, we are very satisfied.
    5 Stars By Laurel from Greenland - 2017.03.28 16:34
    Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Michaelia from Nigeria - 2018.09.29 13:24
    Write your message here and send it to us