cpnybjtp

Products

OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Dependable good quality and very good credit score standing are our principles, which will help us at a good -ranking position. Adhering towards the tenet of quality initial, shopper supreme for Ac Motor Controller, Planar Robot Arm, Numerical Control System, We sincerely expect exchange and cooperation with you. Let us move forward hand in hand and achieve win-win situation.
OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker Detail:

Product Parameters

Application: Lathe and Turning Center, CNC Boring Machine, CNC wood working machine, CNC Milling machinery, CNC drilling machinery, and especially automatic equipment

Axis: 1-10axis

Machinery Test Report: Provided.

Function: Support ATC, Macro function, and PLC displayer

Core Components: PLC, CNC, Macro program, CNC controller.

CPU: ARM(32bits)+DSP+FPGA.

Port: 56input 32output

Weight: 8KG

User Store Room: 128Mb

Interface:USB+RS232 Communction Port.

Supply Ability:10000 Set/Sets per Month.

Warranty:2 Years

product-description1

Parameter details(G code shows)

1. Locate rapidly: G00
2. Straight line interpolation: G01
3. Arc interpolation: G02/03
4. Cycle of cutting cyliner or cone: G90
5. Cycle of cutting end face: G94
6. cycle of cutting thread: G92
7. Fixed cycle of tapping: G93
8. Cycle of rough cut in excircle: G71
9. Cycle of rough cut at end face: G72
10. Cycle of closed cut: G73
11. Cycle of drill deep hole at end face: G74
12. Cycle of cutting groove with external diameter: G75
13. Cycle of cutting compound thread: G76
14. Cycle of program: G22,G800
15. Local coordinate system: G52

16. Detect the instruction of skip: G31,G311
17. Pole coordinate: G15, G16
18. Metrical/Imperial programme: G20,G21
19. Set coordinate, offset: G184,G185
20. Workpiece coordinate system: G54~G59
21. Tool radius C: G40, G41, G42
22. Accurate locating/continuous path process: G60/G64
23. Feeding mode: G98,G99
24. Backing to start point of program: G26
25. Backing to the fixed point: G25, G61, G60
26. Backing to the datum point: G28
27. Suspend: G04
28. Macro Program: G65, G66, G67
29. Auxiliary function: S, M, T

Customer Praise

Customer praise  (1)
Customer praise  (13)
Customer praise  (14)
Customer praise  (16)
Customer praise  (17)
Customer praise  (15)

Customer Case

Customer praise  (18)
Customer praise  (23)
Customer praise  (19)
Customer praise  (20)
Customer praise  (21)
product-description1
Customer praise  (22)


Product detail pictures:

OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures

OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker detail pictures


Related Product Guide:

Our rewards are lower costs,dynamic profits team,specialised QC,potent factories,high-quality services for OEM Factory for 3 Axis Stepper Motor Kit - 1-10 Axis Lathe Milling Turning Center Drilling Controller 1500MD – Newker , The product will supply to all over the world, such as: St. Petersburg, Pretoria, Montreal, We rely on high-quality materials, perfect design, excellent customer service and the competitive price to win the trust of many customers at home and abroad. 95%products are exported to overseas markets.
  • This company has the idea of better quality, lower processing costs, prices are more reasonable, so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Edith from Philippines - 2018.09.16 11:31
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Elsie from luzern - 2017.06.16 18:23
    Write your message here and send it to us